I my productive enviroment, I need to supply raw material production loads to a machine.
The load serves more that one order.
I need to:
- Deliver from the raw material to production and report that material as WIP
- As I consume the machine load, I need to assign the production to a specific production order and affect the finish product warehouse
- When the order is finished, i need to consider the rest of the load as WIP until I new order begins and I assign the load to that new production order.
Some Dynamic experts told me that was not possible....
I do not believe them!
Advise please!